AI in Mantix

AI that knows your plant — and shows its working.

It answers from your own records and manuals, never the open internet. It proposes; a named person decides. Every feature has its own off switch.

A real answer from the demo plant

Ask Einar.

Einar looked up the repair history for P-101, found four seal jobs — three of them in two weeks — and compared it with the planned interval.

Answer generated live by the AI on the demo plant’s data, shown unedited.

EinarAnswers from the plant’s records
How often do we replace the mechanical seal on P-101, and is that normal?
In your records, the mechanical seal on P-101 was replaced 4 times, typically every 9 days (range 5–279), last on 15 Sep 2026. This frequency is not normal, as the planned replacement interval is every 8000 hours. The short interval and repeats within 30 days suggest a cause not being fixed, such as alignment, dry running, wrong part, or fitting.AI · from the plant’s Mantix records only — check before you act
What it does

Nine ways AI helps the planner.

The Productivity Pack adds AI on top of the Site plan, with ₱5,000 of AI usage a month included. Smart cards stay included for everyone.

PRO

Einar, the AI helper

Ask in English, Tagalog or Taglish and get the answer from your work orders, readings and manuals — with the order numbers behind it.

PRO

Manual search

Attach the OEM manual (scanned pages too). Einar quotes the page: “tighten the gland bolts to 25 Nm, p. 4”.

PRO

Manual → PM plan

The manual’s maintenance table becomes proposed plans and task lists, each quoting its page. A planner accepts them.

PRO

Manual vs. reality

“The manual says 8,000 hours; your seals last 9 days.” A cause to find, raised before you buy more parts.

PRO

Failure prediction

A reliability curve per machine: its chance of failing in the next 30 days, and whether PM can prevent it.

PRO

Failure-mode suggestion

Operators write what they see — in Taglish if they like — and Mantix proposes the failure mode from your catalog.

PRO

Schedule leveling

Fits the next weeks of work to the hours each crew really has, holidays included, and shows every move first.

PRO

Task-list drafting

From the asset type and its history, or a photo of the manual page — safety steps first, approved by a planner.

Included

Smart cards

Shortages that will stop work, readings heading for a limit, overdue critical work, people away with jobs — each with its “Why?”.

Manual vs. reality PRO

The manual says one thing. Your machine says another.

Mantix compares what the manufacturer prescribes with how often the job really comes back — and raises the gap as a smart card.

Manual vs reality smart card
Manual → PM plan PRO

From a PDF to a PM plan, page by page.

Every proposed task quotes its page. Accept, edit or skip — nothing becomes a plan without a planner.

Proposed PM plans from a manual
AI proposes. People decide.

AI you can stand behind.

Your data only

Answers come from your company’s own records and manuals. No open internet, and nothing shared unless you opt into anonymous benchmarks.

Every suggestion explained

Each card shows its confidence and a “Why?” with the numbers behind it. Einar cites the orders and pages it used.

A person accepts

Nothing changes until someone accepts it. Each AI feature has its own off switch, and every use is listed in the AI register.

Take the next step

See Mantix on your own equipment.

Start with the two-minute tour, book a live session on your use case, or claim one of the five founding pilot seats.

Or call +63 976 611 7321

Apply for a pilot site · 5 seats